The project involved the construction of four road bridges and one railway bridge, built with a mixed steel-concrete structure, with spans ranging from 35.50 to 52 meters.
As part of the intervention, additional works were carried out, including the stabilization of slopes through anchoring and the construction of retaining structures with integrated protective barriers.
Consorzio CEC – Società Quattrini
2021 - ongoing
Rieti, Italy
Executive design of 5 bridges and retaining structures
Ing. Luciano Gioacchini
12.000.000€
Infrastructures